Sustainable dairying

Installation example

Sustainable dairying

Dairying
Germany

19,7 MW

Total capacity of the installation

Burner

2 x gas burners
marathon® M 10001.2 ARZ
MONObloc

LOW-NOx with internal flue gas recirculation ARZsuper

Boiler

Double flame tube
Steam boiler ZFR
Bosch

marathon® burner courier

Subscribe for our newsletter!

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.